Search
That this Committee calls on the Manager to report on progress made in relation to the delivery of the much needed and debated pedestrian crossing on Fortunestown Lane which will serve the residents of MacUilluim Estate.
That this Area Committee, noting the recently-received request from the Griffeen Glen Residents Association, again requests the Manager to install a timer-controlled locking mechanism on the pedestrian gate at Griffeen Glen Park/Elm Green so as to address anti-social behaviour in the vicinity of the gate; and to add barriers at either side of this gate to dissuade speedy approach to the gate by scrambler bikes, etc.
"To ask the Manager for a report on the repair of damaged speed ramps within the Committee's area, includinga a listing of those being repaired and a timescale?"
That this Committee applies through the Council to Central Government to allocate funds to install a smooth surface, instead of the mini pebbles in the Playground in Corkagh Park.
"To ask the Manager to remove the damaged sleepers and repair any loose sleepers in Firhouse Village Park?"
"To ask the Manager to advise on a firm and accurate start date for works to begin on speed-ramp on Firhouse road.?"
That this Area Committee requests the Manager to engage with Esker Educate Together NS, the Department of Education and Castlethorn Developments to address outstanding safety concerns and other issues which have arisen since the opening of the new temporary accommodation at Adamstown Avenue, including in particular the provision of:
- a signalised or school warden crossing on Adamstown Avenue;
- signage, road markings and other safety measures in the vicinity of the school; and
- directional signage within Adamstown to indicate the location of the school.
To ask the Manager how much this council has contributed to the pre-construction costs of the Poolbeg incinerator?
To ask the Manager to explain, the difference between a Part 8 Planning process and the standard planning process and the length of time that each granted permission can last?
PRESENTATION from CONNECT IRELAND
H9 1st Item after tea break (5.20 pm)
"To ask the Manager,to remove the small shrubs on Ballycullen Drive,(Location on back wall of Killakee view on Ballycullen Drive) which year on year block the pathway during the summer months?
To ask the Manager that the grass bank damaged during the cycle path construction is repaired and re-seeded as it is in a very unsightly condition?
UPDATE ON THE 2012 ARBORICULTURAL WORKS PROGRAMME
To ask the Manager that the goalposts on the GAA pitches in Corkagh Park (Community Centre side) are painted and the posts on the smaller pitch are repaired?
To ask the Manager to report on whether protecting and enhancing the stone walling throughout the Village would qualify for grant aid from the Structures at Risk Fund?
To ask the Manager for a report on the ownership and planned action regarding the stone walling damaged recently at the Nangor Road entrance to the Mill Centre?
To ask the Manager to report on the recent development regarding the lack of vehicular access to Saggart Cemetery and consider options to enable older residents attend the graveyard?
Cathaoirleach's Business (No Business)
Cathaoirleach's Business (No Business)
Cathaoirleach's Business (none received)