Council Meetings

Agenda - November 2026 Lucan / Palmerstown / North Clondalkin Area Committee Meeting

Back to Meetings
Date:
24/11/2026 15:00
Location:
Council Chamber

Headed Items

H-I (1)
Submitted by:
LPNC Meeting Administration
Responsibility:
LPNC Meeting Administration

Confirmation & Re-Affirmation of October's Minutes.

Environment

Questions

Qu (1)
Submitted by:
Councillor H. Farrell
Responsibility:
Jonathan Hennessy

To ask the Manager for a full report to date on the current status of the implementation of plans for the Canal Loop Greenway, the progress, any issues around land ownership, potential issues and delays, information on the school spurs planned and a full and detailed implementation plan for the remaining tranches of the project, where possible.

Qu (2)
Submitted by:
Councillor D. Loftus
Responsibility:
Jonathan Hennessy

'To ask the manager for an update to initiate a consultation with residents regarding permeability between the Paddocks and Hillcrest Heights, following the recent taking-in-charge of the Paddocks, previously cited as being the difficulty with progressing this prospect?'

Qu (3)
Submitted by:
Councillor L. O'Toole
Responsibility:
Andy McNally

Can the Chief Executive confirm how many Bulbs Not Bonfires packages were distributed to residents and community groups across the Lucan, Palmerstown and North Clondalkin areas in 2026? Could the response provide a breakdown by area including the names of the groups that received packages and the number allocated to each?

Qu (4)
Submitted by:
Councillor L. O'Toole
Responsibility:
Andy McNally

Can the Chief Executive confirm how many fines have been issued for dog fouling offences in the Lucan Electoral Area over the past 12, 24 and 36 months, with a breakdown for each 12-month period? Can Management also confirm how many of these fines have been paid and how many remain outstanding?

Headed Items

H-I (2)
Submitted by:
Environment, Water & Climate Change
Responsibility:
Andrew O'Mullane, Jonathan Hennessy

Update on Griffeen Valley Park Bridge Replacement (Grand Canal to Lucan Urban Greenway Ph1c)

H-I (3)
Submitted by:
Environment
Responsibility:
Environment

New Works (No Business)

Correspondence

Cor (1)
Submitted by:
Environment
Responsibility:
Environment

Correspondence (No Business)

Motions

Mot (1)
Submitted by:
Councillor H. Farrell
Responsibility:
Andrew O'Mullane

To call on the Manager to agree to, and outline the delivery of the remedial work needed to make the paving blocks in the village green less of a trip-hazard (the blocks with grass in the centre) and to raise the central part of each block, to ensure those with foot-drop, cane or crutch users, or other mobility device users are not disenfranchised in using areas of the village green due to this issue.

Water & Drainage

Questions

Qu (5)
Submitted by:
Councillor L. O'Toole
Responsibility:
Pat Clarke

Can the Chief Executive provide details of the current inspection, cleaning and maintenance programme for culverts, rivers, streams and drainage channels across the Lucan Electoral Area, to help prevent blockages and potential flooding? Can Management also confirm whether any areas of concern or potential flood risks have been identified, and what works are planned to address these?

Headed Items

H-I (4)
Submitted by:
Water & Drainage
Responsibility:
Ger Staunton, Pat Clarke

Liffey Barrier Mitigation Scheme 

Correspondence

Cor (2)
Submitted by:
Water & Drainage
Responsibility:
Water & Drainage

Correspondence (No Business)

Public Realm

Questions

Qu (6)
Submitted by:
Councillor H. Farrell
Responsibility:
Andy McNally

To ask the Manager for an update on the proposed digitisation program for the historic Cemetery records for Lucan's Old Esker Cemetery / St. Finian's Cemetery as a public local history project, along with any updates on costings, timelines, or other associated issues.

Qu (7)
Submitted by:
Councillor D. Loftus
Responsibility:
Suzanne Furlong, Laurence Colleran

To ask the Manager if they can clarify when the full sized soccer pitch in Quarryvale Park will be ready for use by local clubs

Qu (8)
Submitted by:
Councillor D. Loftus
Responsibility:
Suzanne Furlong, Laurence Colleran

To ask the Manager if they can clarify if it is possible for the soccer pitch in the field next to St. Peter the Apostle to be expanded to a full sized soccer pitch.

Qu (9)
Submitted by:
Councillor L. O'Toole
Responsibility:
David Fennell

That the Chief Executive examine what additional measures could be introduced to reduce the ongoing damage to our parks, open spaces and public amenities during the Halloween period across Lucan, Palmerstown and North Clondalkin. Given the significant costs and Council resources involved in annual clean-up and repair works I request that the response include: - A breakdown of incidents, affected locations and associated costs for Halloween 2026. - Whether recurring blackspots have been identified if incidents have increased in particular areas or if new locations are being targeted. - A comparison with previous years to assess the effectiveness of existing measures. - The possibility of publishing an annual report outlining incidents, damage and costs to raise public awareness. Could the Chief Executive also outline any new or alternative preventative measures that could be introduced for Halloween 2027 working with local communities and relevant agencies, to help reduce damage and the recurring financial burden on the Council

Qu (10)
Submitted by:
Councillor L. O'Toole
Responsibility:
David Fennell

Can the Chief Executive provide an update on the current status of the tree planting and replacement programme across the Lucan Electoral Area, including how many trees have been planted or replaced to date? Can Management also confirm how many trees are scheduled for planting or replacement during the current planting season, and identify the locations where these works are planned?

Headed Items

H-I (5)
Submitted by:
Public Realm
Responsibility:
Public Realm

New Works (No Business)

Correspondence

Cor (3)
Submitted by:
Public Realm
Responsibility:
Public Realm

Correspondence(No Business)

Motions

Mot (2)
Submitted by:
Councillor Joanna Tuffy
Responsibility:
David Fennell

Cathaoirleach's Business

To ask the CEO to have the trees cut back at Esker Glebe at the cul de sac numbers 13 to 21* details supplied *with due sensitivity to wildlife and birds in the carrying out of these works

Mot (3)
Submitted by:
Councillor V. Casserly
Responsibility:
David Fennell

That this Area Committee calls on the Chief Executive to undertake a renewed comprehensive tree survey throughout Hillcrest Estate, Lucan, assessing the condition, suitability, structural integrity and potential safety risks associated with existing street trees. This follows my previous motion in January 2016 requesting an audit of tree suitability and size, subsequent representations in November 2016 seeking prioritised maintenance, and my May 2026 motion concerning tree maintenance and sightlines on Hillcrest Green. In light of the recent storm, which resulted in trees coming down in Meadowview Grove, I am requesting that particular attention be given to mature trees, their condition and suitability within residential areas. I further request that the Council outline when the last comprehensive survey was undertaken, identify any necessary remedial works and provide a timeline for their completion, with priority given to any identified public safety concerns.

Mot (4)
Submitted by:
Councillor C. Brady
Responsibility:
Andy McNally

That this committee formally recognises, commends, and congratulates the Tidy Towns Committees of Adamstown and Lucan for their outstanding achievements in the 2026 SuperValu Tidy Towns competition. Adamstown continued its strong progress, increasing its score to 256 points in only its second year of participation. Lucan achieved an excellent score of 394 points, securing a second consecutive Gold Medal and once again recording the highest mark in South Dublin. It is requested that letters of congratulations be sent to both committees, conveying our appreciation and acknowledging their dedication, community leadership, and the positive impact of their work on the local environment.

Mot (5)
Submitted by:
Councillor H. Farrell
Responsibility:
David Fennell

That this Area Committee requests the Chief Executive to examine the feasibility of establishing a community-led Pocket Forest (native mini woodland) of approximately 100-200m² in a suitable location within Vesey Park or Griffeen Valley Park. A Pocket Forest uses densely planted, locally appropriate native trees and shrubs to establish a small woodland habitat, supporting biodiversity, pollinators, birds and ecological connectivity. The report should identify a suitable site, taking account of existing habitats, protected species, recreational use and accessibility, and outline: Estimated establishment costs, including plants, soil preparation, mulch and signage; Maintenance requirements, particularly during the first three years; Opportunities for participation by local schools, residents and environmental groups; Potential funding sources and an indicative delivery timeline.

Mot (6)
Submitted by:
Councillor T. McDonald
Responsibility:
David Fennell

Ask the Manager to examine solutions for the ongoing anti-social behaviour that occurs on the laneway between Glenvale and Abbeywood and opens onto the R136. Enhanced lighting of the area, pruning of overhanging trees to help with visibility and maybe consider a trial of CCTV in the area should be considered.

Mot (7)
Submitted by:
Councillor C. Brady
Responsibility:
David Fennell

That this committee calls on the Chief Executive to ensure that the enhanced public realm area at Dodsboro Shopping Centre, adjacent to Spar, is regularly cleaned and maintained and to outline the maintenance arrangements for this area, so that the public investment made through the Part 8 upgrade is protected and the space is maintained to an appropriate standard for residents, businesses and visitors.

Housing

Questions

Qu (11)
Submitted by:
Councillor C. Brady
Responsibility:
Fiona Hendley

To ask the Chief Executive for a list of all Affordable Home Purchase schemes currently in the pipeline within the LEA and adjoining LEA including: The location and number of affordable homes proposed under each scheme. The anticipated date on which applications are expected to open. The current stage of delivery for each scheme. Whether a system is available, or could be made available, for residents to register their interest and receive notification when applications for a particular scheme open. This information would assist prospective purchasers in planning for upcoming affordable housing opportunities within the county.

Qu (12)
Submitted by:
Councillor D. Loftus
Responsibility:
Amanda Mills

To ask the Manager to provide a list of the vacant council homes in Palmerstown Fonthill LEA and clarify how long each of these homes have been left vacant.

Headed Items

H-I (6)
Submitted by:
Housing Administration
Responsibility:
Vivienne Hartnett

Housing Delivery Report (For Noting)

Questions

Qu (13)
Submitted by:
Councillor D. Loftus
Responsibility:
Michael Murtagh

To ask the Manager to provide a list of the vacant private homes in Palmerstown Fonthill LEA, clarify how long each of these homes have been left vacant and state how much the owners of these homes have paid in vacant homes tax?

 

Headed Items

H-I (7)
Submitted by:
Housing Administration
Responsibility:
Amanda Mills

Housing Allocations Report quarterly (For Noting)

H-I (8)
Submitted by:
Housing Administration
Responsibility:
Fiona Hendley

Quarterly Report on Anti Social Behaviour (For Noting)

H-I (9)
Submitted by:
Housing Administration
Responsibility:
Amanda Mills, Fiona Hendley

Balgaddy Housing Quarterly Update (For Noting)

H-I (10)
Submitted by:
Housing
Responsibility:
Housing

New Works (No Business)

Correspondence

Cor (4)
Submitted by:
Housing
Responsibility:
Housing

Correspondence (No Business)

Questions

Qu (14)
Submitted by:
Councillor C. Brady
Responsibility:
Amanda Mills

To ask the Chief Executive for an update on the Energy Retrofit Programme and whether tenants identified for energy retrofit works may be prioritised for inclusion in the 2027 programme?

Community

Headed Items

H-I (11)
Submitted by:
Community
Responsibility:
Community

New Works (No Business)

Correspondence

Cor (5)
Submitted by:
Community
Responsibility:
Community

Correspondence (No Business)

Motions

Mot (8)
Submitted by:
Councillor L. O'Toole
Responsibility:
Maria Nugent

That this Area Committee requests that CE allocate funding from the €1.1 million Community Grant provision in Budget 2027 to support a range of initiatives providing affordable and inclusive access to Lucan Swimming Pool. This would build on proposals I previously raised with the Council and Aura and existing initiatives, for example the swimming lessons provided to local youth services. The Council is requested to work with Aura and local community organisations to develop these opportunities and report back on potential programmes, costs and delivery during 2027.

Transportation

Questions

Qu (15)
Submitted by:
Councillor H. Farrell
Responsibility:
John Hegarty

To ask the Manager when the belisha beacons on the Earlsfort Roundabout will be activated and whether or not a safety review could be conducted at this location following a recent accident on the crossing with a child, at night-time. In particular, the section of the roundabout closest to Eurospar seems to have a lower level of lighting at the pedestrian crossing near Earlsfort.

Qu (16)
Submitted by:
Councillor H. Farrell
Responsibility:
John Hegarty

To ask the Manager for a full update on the plans for, or the results of the accessibility review of parking spaces planned for Lucan village originating in MembersRep: 1921263 and agreed to by the manager. The report should include all the recommendations, likely implementation timeline, costings, impact on the village, and the nature of the improvements for people who need to use these accessible spaces in our village.

Qu (17)
Submitted by:
Councillor A. Hayes
Responsibility:
Gary Walsh

To ask the manager for a date when the small pay and display area outside 2 Kennelsfort Road Upper will be relined following resurfacing works in 2025.

Qu (18)
Submitted by:
Councillor T. McDonald
Responsibility:
Gary Walsh

Could the Manager confirm when the the flooding works in front of St. Kevin's Community College on the Fonthill Road will be carried out? The works were requested earlier this year but have yet to be commenced.

Qu (19)
Submitted by:
Councillor T. McDonald
Responsibility:
Caitriona Lambert

Can the Manager provide an update on ticket: 1939480 and when light pole numbers 6 and 7 in Colthurst Crescent are likely to be repaired? The road is very dark here and residents are looking for these to be fixed asap.

Headed Items

H-I (12)
Submitted by:
Transportation
Responsibility:
John Hegarty

Declaration of Roads to be Public Roads

Post Consultation Report on the proposal to Take in Charge Adamstown Avenue (Part of), Adamstown Park (Part of) and Station Road (Part of)

H-I (13)
Submitted by:
Transportation
Responsibility:
Transportation

New Works (No Business)

Correspondence

Cor (6)
Submitted by:
Transportation
Responsibility:
Transportation

Correspondence (No Business)

Motions

Mot (9)
Submitted by:
Councillor C. Brady
Responsibility:
Gary Walsh

That this Committee calls on the Chief Executive to prioritise the resolution of the long-standing road subsidence issues at Dodsboro, details provided in members reps. 1902297, 1904899, and 1924020 your refs. RMCCT01897 and RMCCT02183, and and to carry out any and all investigations and remedial works necessary to resolve the matter, reporting on the cause of the subsidence, the works required and the expected delivery timeframe for the required remedial works.

Mot (10)
Submitted by:
Councillor M. Johansson
Responsibility:
Caitriona Lambert

That the Chief Executive improve the public lighting/visibility at the new pedestrian crossings on the roundabout at Earlsfort estate. There was a recent accident there and the area is very poorly lit.

Mot (11)
Submitted by:
Councillor A. Hayes
Responsibility:
Caitriona Lambert

That SDCC commit to replacing public lighting pole identification numbers where they are no longer visible, potentially at the same time that bulbs are being replaced.

Mot (12)
Submitted by:
Councillor D. Loftus
Responsibility:
LPNC Meeting Administration

That this Area Committee requests the Chief Executive to write to Evara, regarding scheduled maintenance of the grass verges along Station Road and elsewhere in Adamstown, as yet, not taken-in-charge

Mot (13)
Submitted by:
Councillor C. Brady
Responsibility:
Gary Walsh

This committee calls on the Chief Executive to review the current road markings on the R835 Leixlip Road adjacent to Maxol, Lucan, with a view to reinstating the original road layout and removing temporary hashed white line markings that were installed as part of traffic management measures following the collapse of the stone wall at Lucan Demesne. Following the reconstruction of the wall, completion of the new footpath, and removal of the temporary pedestrian walkway and barriers, the temporary road markings no longer appear to serve their original purpose. The Council is therefore requested to restore the road markings to their previous configuration and to provide a timeline for same.

Mot (14)
Submitted by:
Councillor L. O'Toole
Responsibility:
John Hegarty

That the Chief Executive revisit previous requests to install additional No Right Turn signage at Courtney's in Lucan Village for traffic travelling west to east and turning onto Adamstown Hill commonly known as Courtney's Hill. Despite existing signage concerns continue to be raised regarding the number of motorists ignoring the No Right Turn restriction, which I have also witnessed firsthand. Given that the current signage is located on only one side of the road and appears insufficient this Committee requests that additional, more visible signage be installed to improve compliance and road safety at this junction.

Planning

Headed Items

H-I (14)
Submitted by:
Planning
Responsibility:
Planning

New Works (No Business)

Correspondence

Cor (7)
Submitted by:
Planning
Responsibility:
Planning

Correspondence (No Business)

Motions

Mot (15)
Submitted by:
Councillor L. O'Toole
Responsibility:
Hazel Craigie

That the Chief Executive provide a report on the trees within the Finnstown Castle lands outlining what surveys or assessments are currently held on file and identifying any trees already protected or subject to Tree Preservation Orders (TPOs). Where a comprehensive survey has not been carried out could one be undertaken as soon as possible to identify trees of heritage, environmental or ecological significance that may warrant protection? Could the response also clarify any obstacles to progressing this work and whether the process of assessing and introducing additional Tree Preservation Orders can commence without delay?

Economic Development

Headed Items

H-I (15)
Submitted by:
Economic Development
Responsibility:
Economic Development

New Works (No Business)

Correspondence

Cor (8)
Submitted by:
Economic Development
Responsibility:
Economic Development

Correspondence (No Business)

Motions

Mot (16)
Submitted by:
Councillor L. O'Toole
Responsibility:
Paul Fusco

That the Chief Executive outline what steps and considerations would be involved in exploring the potential acquisition of the St Edmundsbury lands for public ownership with a view to developing the lands as a public park and amenity. Can Management advise whether South Dublin County Council could engage with the relevant Government Department and Minister to explore possible funding and acquisition options and what process would be required to progress such a proposal?

Libraries & Arts

Headed Items

H-I (16)
Submitted by:
Libraries & Arts
Responsibility:
Libraries & Arts

Library News & Events

H-I (17)
Submitted by:
Libraries & Arts
Responsibility:
Libraries & Arts, Yasmin Mello, Richie O'Sullivan

Arts Programme Update

Correspondence

Cor (9)
Submitted by:
Libraries & Arts
Responsibility:
Libraries & Arts

Correspondence (No Business)

Corporate Support

Headed Items

H-I (18)
Submitted by:
Corporate Support
Responsibility:
Corporate Support

New Works (No Business)

Correspondence

Cor (10)
Submitted by:
Corporate Support
Responsibility:
Corporate Support

Correspondence (No Business)

Motions

Mot (17)
Submitted by:
Councillor Joanna Tuffy
Responsibility:
LPNC Meeting Administration

Cathaoirleach's Business

That a letter be sent from the Area Committee to Weston Airport to request a meeting with councillors from the ACM with management of the Airport, including the Noise Community Liaison Officer and the senior person responsible for flight paths of the Search and Rescue Service, to discuss a number of items in advance of the opening of the new hangar at the Airport from which the Search and Rescue Service is due to operate from, it operating currently on a temporary basis from an existing hangar, including clarification regarding the flight path, noise mitigation and community liaison with local residents and facilitation of communication between the community liaison officer and local residents.

Mot (18)
Submitted by:
Councillor L. O'Toole
Responsibility:
LPNC Meeting Administration, Sharon Conroy

That the Chief Executive provide an urgent update on the status of the Liffey Valley Monitoring Committee given that no meeting has taken place despite repeated requests from members. In light of the recent response issued to members this Area Committee requests that Council Management engage with Fingal County Council to arrange an immediate meeting of the Monitoring Committee. Can Management also ensure that all outstanding reports, minutes and relevant documentation arising from the January 2025 meeting are circulated to members without further delay?

Performance & Change Management

Headed Items

H-I (19)
Submitted by:
Performance & Change Management
Responsibility:
Performance & Change Management

New Works (No Business)

Correspondence

Cor (11)
Submitted by:
Performance & Change Management
Responsibility:
Performance & Change Management

Correspondence (No Business)