Update on Flood Alleviation (including CFRAMS) and Surface Water Schemes 

The update on the flood alleviation schemes and the surface water schemes is as follows:

Ballycullen Stream Flood Alleviation Scheme

Following a number of flooding events in the Castlefield area, the Drainage Section of the Council has examined the flooding problem and after reviewing various options it has concluded that a duplication of the existing culvert is the preferred solution to alleviate flooding in the area.

The contract for the construction of this scheme was awarded to Clonmel Enterprises Ltd. in February. Works on site are now complete 2 months ahead of schedule. We have now entered the 12 month defects period.

River Poddle Flood Alleviation Scheme

Following the severe flooding event of 24/25th October 2011 the OPW agreed and provided the extra funding to undertake the Catchment Flood Risk Assessment & Management Study (CFRAMS) of the Poddle. The final report on these was forwarded to the OPW who has since approved the Draft Design Brief for the River Poddle Flood Alleviation Scheme. The appointment of consultants is expected in early September. The letter of intent and the letters to the unsuccessful tenderers have been issued. There was an objection from one of the eliminated tenderers. Dublin City Council forwarded the appeal to Engineers Ireland to make an adjudication. Engineers Ireland have upheld the decision of the Tender Assessment Board and the appointment of the consultant is now proceeding. Consultants will be appointed in early February.

In order to progress the environmental assessment for the works at Tymon Park SDCC engaged Roughan & ODonovan following a competition in December. Work on a Winter Habitiat Survey is currently progressing in Tymon Park and the results of this will feed into the Environment Assessment for the project.

Camac Flood Alleviation Scheme

The overall scheme for the Camac did not meet the OPW cost benefit criteria to progress work on the river in its entirety. A steering group has been set up to consider works at specific locations on the Camac River, SDCC and the OPW have met on site and walked the Camac. The OPW have drafted a brief for the appointment of Consultants to carry out the design of flood alleviation measures at these specific locations and this is currently being reviewed by SDCC and DCC. 

Whitechurch Stream Flood Alleviation Scheme

As part of the Dodder CFRAMS there is a proposed scheme for the Whitechurch Stream. The OPW have confirmed funding for the procurement of a consultant engineer for the scheme. We are currently drafting a design brief for this and will submit the brief when complete to the OPW prior to engaging the consultant through the DCC framework.

 

2018 SURFACE WATER MINOR WORKS PROGRAMME:

1 Surface Water Sewer Systems;

Location

Project

Update on Project

Tay Lane, Rathcoole

Flood attenuation

Next phase. Continued from 2017

Glenmaroon

 

Localised surface water improvement – to address a Surface Water issue on Glenmaroon Road.

In Planning.

Main Street, Peamount Road, Newcastle.

Localised surface water improvement

Carried over from 2017

Celbridge Road

 

Surface water improvement scheme – collapsed culvert restoration.

Works complete.

Ballyowen Lane, Lucan.

Surface water improvement scheme – to assist Public Realm where necessary to complete pitch works

Next phase. Continued from 2017

Templeogue Village

Initial assessment and feasibility study.

Phase 1. Carried over from 2017

Stocking Lane, Rathfarnham.

Culvert upgrade

Phase 1. Carried over from 2017

Old Lucan Road near village

Localised surface water improvement

Multi annual scheme in conjunction with Roads

Butterfield Park

 

Localised surface water improvement

In planning.

Nangor Road/Ninth Lock Road Junction, Clondalkin.

Localised surface water improvement

In planning. Carried over from 2017

The majority of the above schemes are at preliminary stage and are subject to detailed design and full budgetary estimates.

 

 

2 Flood Alleviation Minor Capital Works – Rivers & Streams

 

 

Location

Project

Update on Project

Camac River

Clearing and regrading

In planning

Poddle River

Clearing and regrading

In planning

Jobstown stream

Regrading, dredging and cleaning. Provision of a better aesthetic area to discourage illegal dumping into the stream.

In planning

River CCTV & Telemetry

2 sites; Camac at Toyota and Tallaght Stream at Sean Walsh Park

In planning

Rain Gauge Upgrade

5 sites

In planning

Owendoher Stream

Clearing and regrading

In planning