
MEETING OF SOUTH DUBLIN COUNTY COUNCIL
Monday, June 12, 2017
QUESTION NO.5
QUESTION: Councillor W. Lavelle
To ask the Chief Executive to provide a list of playing pitches which are to be subject of improvement works as part of the 2017 Pitch Maintenance Programme?
REPLY:
Pitch improvement works as set out in the following list are proposed to be carried out over the 2017/2018 period.
Drainage works:
- Re-orientation of pitch at Tymon Park/Colaiste de hÍde, including necessary drainage works.
- Firhouse/Dodder Valley Park, installation of a drainage system on Pitch 107.
- Pitch at Mount Andrew Open Space, installation of a drainage system
- Butler McGee Park (St Mark’s pitch) , installation of a drainage system
- Pitch at Jobstown Park, installation of a drainage system
- Tymon Park Pitch 25, minor drainage works required.
Goal post replacement:
Beechfield Park, 2 pitches
Ballymount Park Pitch 95
Glenaulin Park Pitch 28
Goalmouth improvement works:
- Beechfield Park, 2 pitches.
- Ballycragh Park, 2 pitches.
- Tymon Park, 3 pitches.
- Jobstown Park, 2 pitches.
- Fettercairn/Butler McGee Park, 2 pitches.
- Cherryfield Park, 2 pitches.
- Clondalkin Park Pitch 47
- Clondalkin Park Pitch 49
- Clondalkin Park Pitch 50
- Corkagh Park Pitch 51
- Corkagh Park Pitch 52
- Corkagh Park Pitch 53
- Corkagh Park Pitch 54
- Corkagh Park Pitch 56
- Corkagh Park Pitch 57
- Corkagh Park Pitch 60
- Corkagh Park Pitch 61
- Ballymount Park Pitch 93
Other works:
- Ballymount Park Pitch 95, Pitch rotation required.
- Pitches 31, 32, 33, 34 & 163 fertilising and aeration and all goalposts to be painted.
- Griffeen Valley Park, Lucan Sarsfield Pitch no 11 to be fertilised and over seeded, also both goalmouths aerated and re-sodded.
- Pitch no 12 to be fertilized and one goalmouth re-sodded.
- Lucan United pitches 1, 2 & 3 to be fertilised and aerated.
- Hermitage Park Pitches 17, 18, 19, 20 to be fertilised.
- Glenaulin Park Pitch 28, pitch realignment required.
- Griffeen Valley Park Pitch 13, request for removal of mound of soil going down the side of the main pitch (Johnsbridge housing estate) and landscape afterwards to make room for two Junior pitches. To be included in 2018 programme of works.
- Tymon Park Pitches 4 & 5, installation of drainage systems to be included in 2018 programme of works.
- Ballymount Park Pitch 94, installation of drainage system to be included in 2018 programme of works.