That the Manager provide a report on how the Council managed during the recent spell of heavy rainfall and to list any vulnerable locations in the county as a result?

REPLY:

On a continuous basis South Dublin staff monitor all known areas within the county that are vulnerable to flooding. The rivers, streams and drainage network was closely monitored by the Council’s Drainage & Roads staff throughout the recent prolonged rainfall period and in response to MetEireann weather alerts, Council crews were active on the ground taking measures such as cleaning gullies and removing debris from river screens in flood prone areas.

There were no incidents of flooding reported in the South Dublin County Council area during this recent period.

Following the October 2011 flood event, flood alleviation works have been progressed in each Local Electoral Area.

The following is a summary of actions taken by the Council to resolve these issues:

Rathfarnham Description of Works
   
Aranleigh Court Relaying Surface Water Pipes due to tree root infestation
Stocking Avenue Well /Orlagh Avenue Sealing manholes, blocking unused connections to foul sewer
Mount Carmel/Homeville/Castlefield Build manhole at collapsed pipe, connect gulleys to surface water, putting lockable covers on some manholes.
Fortfield Drive Installation of new Surface Water Pipes
Glenlyon Foul sewer diversion adjacent to Glenvara Park
Lucan  
Esker Lane/St Edmundsbury Flushing of sewers and ditch cleaning surface water outfall
Esker Lane & Old Lucan Rd Installation of 2 nr gullys and connections to S/W pipe
Clondalkin  
Lealand Drive [Drainage] Diverting surface water sewer around back of the houses to new outfall
Tuthills Clondalkin Installation of new gully and connection to S/W pipe
Robinhood Stream Cleaning river banks and bed
Lealand Drive [Roads] Installation of 2 No. gullys and installation surface water drain
Newcastle Main St.outside hse no 7 Installation of 5 nr Gullys and connections to S/W Pipe
Woodford Downs Installation of 4 nr double gullys and connection to S/W
New Road Surface Water Diversion Diverted existing collapsed surface water pipe
Tallaght  
   
Hazel Grove, Tallaght Cleaning ditches
Knockmore /Killinarden Flood Relief Works
Saggart Village Installation of 330m of 375 mm diametrer pipe plus 28 gullies and 4 manholes
Garter Lane Saggart Repair existing gully pots and installation of 3 nr gullys pipe and connection to S/W Pipe
Athgoe rd Repair existing gully pot work complete
St Annes Terrace Rathcoole Installation of 3 nr gullys and reconstruct s/w manhole
Brittas Canal Cleaning Cleared culvert under road bridge and removed silt upstream.